Before an old slab comes out, it helps to know whether it has to. A licensed local contractor, reached through the Orem Driveways & Concrete referral service, can break out and pour the replacement. The sections below cover when to replace, what tear-out adds and what the city wants at the street.
Is a cracked driveway worth replacing?
Maybe not. The American Concrete Institute says it is normal to expect some cracking and curling on every concrete project (ACI). A hairline crack along a joint is not a failure.
Concrete Network draws a line here: cracks wider than a credit card that run through the depth of the slab are structural and call for repair or replacement (Concrete Network). Panels that heave, tilt or sink belong in the same worry group.
Can a sunken slab be lifted instead?
Sometimes. Concrete Network says a sinking slab can often be raised back into place by slabjacking, which pumps a cement-based mixture beneath it (source). Lifting is its own specialty, and the contractors matched here do replacement, not lift-only or crack-sealing work. If a lift is all you want, this service is not the right fit; a contractor who does slab lifting is the one to ask.
If the panel sank because the base was never compacted or water runs under it, a lifted slab can settle again. Ask how the contractor reads the cause.
What does tear-out add to the price?
Concrete Network says tearing out and hauling away an existing driveway adds approximately $1.00 per square foot (Concrete Network, a national figure). Haul-away is the part to pin down: ask whether the price covers breaking up, loading and dumping the old concrete, and who pays any disposal fee.
For the new slab, see the per-square-foot ranges on the cost page; a real quote depends on the site, the access and the finish.
What happens to the part at the street?
That is where Orem gets particular. The apron, where the driveway meets the street, sits in the city's right-of-way. Orem Building Safety's handout says drive approaches need an Engineering permit but not a building permit (Orem handout, PDF). Orem Engineering publishes an Application for ROW Excavation Permit as an online form (Orem Engineering).
The city's standard drawing for the combination drive approach calls for concrete 6 inches thick and a 12-foot minimum width. The standard drawings also note that the city may require the owner or developer to pay to remove and replace substandard curbs, gutters, sidewalks and drive approaches at construction time (Orem Construction Standard Drawings, PDF). Concrete Network adds that many municipalities require the apron to be 5 or 6 inches thick, which fits what Orem's drawing shows.
A replacement that touches the approach goes through Orem Engineering. Ask the contractor who applies for the Engineering permit and who books the inspection. Confirm with Orem Engineering through the city main line, 801-229-7000, since rules and fees change. The permits page has the rest.
How does a replacement go?
- The contractor measures, checks the slope and what is under the slab, and writes the scope.
- Utility lines are marked first. Blue Stakes of Utah 811 asks for at least 3 business days' notice before any excavation and says the service is free and required by law (Blue Stakes).
- The old slab is broken up and hauled away. Sod, topsoil and soft spots come out.
- A fresh compacted base goes in, then forms, reinforcement and a new pour. A new driveway needs the same mix, joints and curing as a first one; the new driveways page lists them.
- The new slab cures. Concrete Network says to wait at least 24 hours before walking, about seven days before parking a car and at least 28 days before an RV or large truck.
Why did the old driveway fail?
Look for the cause before paying to repeat it. Common ones: joints spaced too far apart or cut too late, a thin slab under a heavy vehicle, a base that was not compacted, water running under the slab, and scaling from salt on a fresh slab. In a city whose design criteria rate weathering "Severe" (City of Orem), concrete without entrained air is a repeat risk. The Portland Cement Association says entrained air is usually 4 to 7 percent of the volume.
Common questions
Will the new concrete match the old?
Color that does not match on a partial replacement is a known problem. Ask the contractor how the joint between new and old will be handled.
What about sealer?
Concrete Network says resealing about every two years suits a driveway, and every 2 to 3 years for stamped concrete. Ask whether the first coat is in the quote, and avoid deicers the first winter.
How do you ask for a match?
Call (385) 412-2732 or use the form on the contact page. Check any contractor's license on the state's lookup.
Where these numbers come from: Concrete Network for the national tear-out figure, and Orem's handout, Engineering page and standard drawings for the street-end rules, all read in November 2026.