Orem splits concrete work between two city offices. Building Safety handles what is built on your lot, and Engineering handles what touches the street. Orem Driveways & Concrete is a referral service and cannot issue or waive a permit, so the phone numbers below are the ones that count.
Which office handles what?
| Your job | Office | Source |
|---|---|---|
| Plain concrete sidewalk on your own lot | Building Safety: no building permit listed | Orem handout, PDF |
| Concrete porch or patio without a roof | Building Safety: no building permit listed | same handout |
| Drive approach at the street | Engineering permit, not a building permit | same handout |
| Cutting into the public right-of-way | Engineering: ROW Excavation Permit application | Orem Engineering |
| Roofed patio cover | Building Safety: call to ask | Orem Building Safety |
Building Safety answers at 801-229-7198, and Engineering through the City of Orem main line at 801-229-7000. Confirm with them before work starts, because rules and fees change.
Does a driveway or patio need a building permit?
For a sidewalk, porch or patio on your own lot, the city's building-permit handout says no. It lists concrete sidewalks on private property and concrete porches and patios without roofs as not requiring one. A driveway slab on your lot is a question for Orem Building Safety.
The handout also says drive approaches need an Engineering permit but not a building permit.
Building Safety takes permit questions and inspection scheduling at 801-229-7198, at 56 N. State Street, Orem, UT 84057 (Orem Building Safety). Call before you sign a contract, because the handout is a general list and the office answers for your address.
What is the Engineering permit for?
The drive approach crosses the public right-of-way, the strip the city controls between your lot and the road. Orem Engineering publishes an Application for ROW (right-of-way) Excavation Permit as an online form under Construction Management (Orem Engineering).
Engineering decides whether a given approach job needs the excavation permit, what the permit costs and how long it takes. Reach it through the City of Orem main line at 801-229-7000.
On thickness, the city's standard drawing RW-6, the combination drive approach, calls for concrete 6 inches thick and a 12-foot minimum width (Orem Construction Standard Drawings, PDF). The same document notes that, at construction time, the city may require the owner or developer to pay to remove and replace substandard curbs, gutters, sidewalks and drive approaches.
Does Building Safety use an online system?
Yes. Orem requires full online submittal for building permits (Orem building permits), and applications, permits and inspections are tracked in the city's CityInspect portal at orem.cityinspect.com/login (Orem Building Safety). The adopted-codes page lists the 2021 IRC and 2024 IBC among the codes the city enforces. The same page's building-design criteria give a frost line depth of 30 inches and rate weathering as "Severe"; these are design figures, not a forecast (Orem adopted codes). Building Safety takes permit questions at 801-229-7198; confirm there, because rules change.
What do Orem's zoning rules say about the driveway itself?
Zoning is separate from building permits. Orem's zoning code, chapter 14, as shown in a third-party copy, says:
- Driveway area on a residential lot may not exceed 60 percent of the front or side yard it sits in.
- All driveways on a corner lot may not exceed 50 percent of the combined front and street-side yard area.
- Parking on grass or landscaped areas of a front or street-side yard in residential zones is prohibited.
- Driveways to a garage or off-street parking space must be paved with asphalt, concrete or pavers.
These come from a third-party copy of the code (Zoneomics), not the city's own site. The city's own text is the final word, so call the City of Orem at 801-229-7000 before you widen a driveway or add a pad. The RV pad page covers what these limits mean for a big vehicle.
What about a state highway?
A driveway that meets a state highway needs a conditional access permit from UDOT whenever a connection is requested (UDOT access management). If your street might be a state highway, ask Orem Engineering first at 801-229-7000.
Who calls 811?
Blue Stakes of Utah 811 asks to be notified at least 3 business days before any excavation, and says the service is free and required by law (Blue Stakes). Ask the contractor who places the request. It is separate from any city permit.
Who pulls the permit?
Settle it before you sign. Ask in writing:
- Does the apron need a city permit, and who applies?
- Who books the inspection?
- Who pays any permit fee?
- Which license does the contractor hold, and where can it be checked?
The state's license lookup is public, and the concrete specialty classification is S260 Asphalt & Concrete Contractor (Utah DOPL list, PDF). Utah Code 58-55-305 exempts from licensing work on a building with an agreed value under $7,000 including labor and materials (Utah Code). Whether a flatwork job falls under that exemption is for the contractor and the state's licensing division to say.
Common questions
What does the approach permit cost?
Orem Engineering sets the fee. Call 801-229-7000. The cost page covers the price ranges for the concrete itself.
Does an old driveway need a permit to be replaced?
The handout lists drive approaches as needing an Engineering permit, so ask Orem Engineering at 801-229-7000 about replacing the street end. The driveway slab on your lot is a question for Orem Building Safety at 801-229-7198. More on the replacement page.
How do you ask for a match?
Use the form or call (385) 412-2732.
Where these numbers come from: city rules are from the City of Orem's own pages, except the zoning limits, which come from the third-party mirror named above. All were read in November 2026, and rules and fees change.